What Tape-Out Readiness Involves
Beyond individual signoff checks – timing, DRC, LVS, IR drop, EM – tape-out readiness also confirms that scan chains and other design-for-test (DFT) structures are fully verified, that all required waivers are documented and approved, and that the final GDSII merge (combining all blocks, including any hard IP or memory macros) is complete and correctly assembled. Every item on the checklist needs an owner and a verifiable, documented sign-off.
Why It Matters
A single overlooked item – an unwaived DRC violation, an incomplete timing corner, a DFT structure that wasn't fully verified – can mean an entire re-spin, costing months of schedule and significant manufacturing cost. A disciplined, exhaustive checklist process is what turns tape-out from a risky leap into a confident, well-supported decision.